TOY STORE_ABC VERDUN

Design for MEP trades under ABC specifcation,regulations,and decided codes...

Air conditioning :

  1. Chilled water fan coil units
  2. Black steel chilled water pipes
  3. Galvanized round painted exposed duct 
  4. Round rexposed air outlets

Fire fighting:

  1. Black steel pipes and sprinklers modifcation

Supplying of lighting fixtures:

  1. Supplying of track lights 
  2. Supplying of track spots 30 W-cyprus origon
  3. Supplying of different types of spot lights

lighting:

  1. Installation of EMT conduits as per Mall specifications.
  2. Installtion of galvanized flexibles.

Power:

  1. Assembling of relatred panel boards as per specifcatins and reguations.

Low current:

  1. Installation of low current systems involve in the fire alarm,CCTV,data,....

Looking an Adequate Solution for your Project?

Contact us today for conslutaion or more information.

Get In Touch